Hancock County · Northwest Ohio
Wire and cable buyers for Findlay refineries and tire plants
A refinery turnaround and a tire plant cure press have one thing in common: both stop on a schedule, and both leave cable behind when they start again.
Request a quote
Request a quote in Findlay
Tell us the wire type, the quantity and where it is stored.
- Reviewed by a buyer, not a scale
- Reels, pallets, partials or a full truckload
- Anywhere in Ohio, one desk
- 01Send the wire type, quantity and pickup city.
- 02A buyer reviews the lot and replies with a basis.
- 03Freight and release are agreed, then the load is booked.
Lot details
Everything helps, but the wire type, the quantity and the pickup city are enough to start.

Refining sets the tone
Refining and pipeline operations give the county its industrial character. A refinery runs for years and then stops for a turnaround planned to the day: vessels opened, trays pulled, instruments replaced, unit started again. Cable removed in that window is usually tray-rated or armoured, and much of it is still serviceable because it was replaced on a specification change rather than on failure.
Contractors do the work, and contractors demobilize fast. What they cannot take with them goes into a conex or onto a pallet, and the plant inherits it.
Instrumentation is the refinery's cable
The dominant family is instrumentation: shielded pairs, thermocouple extension, and multi-pair cable from field to junction box. Power cable is secondary but present, usually tray cable and feeder to motor control. Tire manufacturing adds a different set entirely, with VFD cable on mixers and extruders, festoon cable on the loaders that serve the curing presses, and portable cord at the building machines.
The two never mix well in one lot. Refinery instrument cable is specified, shielded and usually short; tire plant cable is heavier, dirtier and often cut from a moving machine. Listing them separately is the difference between a review that takes a day and one that takes a week.
- Shielded instrument and thermocouple cable
- Tray cable from unit rewires
- VFD cable on mixers and extruders
- Festoon cable at curing press loaders
- SOOW cord at building machines
Tank farms, spurs and a flat site
Sites here are large and flat, with rail spurs, tank farms and long internal roads. That is good for loading: a trailer pulls alongside a laydown area without a switchback, and a crane lifts a reel from a rack to a flatbed in one pick. The constraint is procedural. A refinery gate applies its own rules to vehicles, and a contractor's material may need a release from the contractor as well as from the plant.
I-75 and US-224 give direct road access, and CSX serves the industrial sites. Truck traffic at a gate is metered, so an arrival time is worth having before the drive.
Turnaround material after the turnaround
The window to buy turnaround surplus is short. Once the unit is up, the material is either in a laydown area waiting for the next outage or already in a scrap bin. Ask for the demobilization date. If a contractor is still on site, the lot is easier to review, because the people who pulled the cable are still there and can say what it was.
Tire plant lots run to a different calendar, tied to press rebuilds and mixer overhauls. Those are smaller, more frequent, and usually stored indoors, often on racks above the maintenance shop.
Where a plant has its own laydown yard, ask whether the material can stay there until a truck is free. Refinery sites tend to be generous with space and strict about access, which is the reverse of a city plant with a shared dock.
Briefs for this city
Related pages
Adjacent cities, wire families and regional briefs.
Questions sellers ask
Do you buy instrumentation cable that has been in a refinery?
Yes, and it is the most common refinery lot. Shielded pairs and thermocouple extension are reviewed on pair count, shield type and footage, with the tag carrying most of the answer. Cable pulled from a unit and coiled without a tag is estimated from the jacket print and the coil weight.
When is the best time to review turnaround surplus?
While the contractor is still demobilizing. At that point the material is gathered, the people who pulled it are on site, and the release is being signed anyway. A month later the same cable is in a conex behind a locked gate and nobody remembers which unit it came from.
Is festoon cable from a curing press loader worth taking?
Often, because those loaders run constantly and the cable is replaced on a schedule rather than on failure. The wear is concentrated at the loop, so the straight sections are usually sound. Photograph the loop and note the conductor count, and the reusable portion is easy to estimate.
Can a contractor release a lot rather than the plant?
Sometimes, and it depends on the contract. Where the contractor supplied the material, it may own the surplus and release it directly. Where the plant supplied it, the plant signs. Ask for the purchase order that covers the material, because that document usually settles who can release it.
Request a quote
Tell the desk what you have in Findlay
Send the basics and a buyer reviews the lot, usually the same working day.
- Reviewed by a buyer, not a scale
- Reels, pallets, partials or a full truckload
- Anywhere in Ohio, one desk
- 01Send the wire type, quantity and pickup city.
- 02A buyer reviews the lot and replies with a basis.
- 03Freight and release are agreed, then the load is booked.
Second look at the lot