Franklin County · Central Ohio
Columbus cable that was ordered twice and used once
The fastest-building metro in the state buys cable in phases and finishes with reels it cannot return. The desk reviews those reels as inventory, not as scrap.
Request a quote
Request a quote in Columbus
Tell us the wire type, the quantity and where it is stored.
- Reviewed by a buyer, not a scale
- Reels, pallets, partials or a full truckload
- Anywhere in Ohio, one desk
- 01Send the wire type, quantity and pickup city.
- 02A buyer reviews the lot and replies with a basis.
- 03Freight and release are agreed, then the load is booked.
Lot details
Everything helps, but the wire type, the quantity and the pickup city are enough to start.

A metro that buys in phases
Columbus builds in phases: a data hall first, then a second, then a power upgrade that was scheduled for later and got pulled forward. Each phase carries its own cable order, and when the schedule moves, the reels that were staged for the old sequence stay wrapped in the yard.
That pattern produces very clean surplus. A pallet of full THHN reels from a deferred phase has never been unwound, still has the mill wrap and the tag, and is worth reviewing as new material. The same warehouse usually holds a second, messier pile from the electricians who worked the first phase, and that one needs sorting before it is worth anything.
What turns up here
Commercial and mission-critical work dominates: THHN and XHHW in the large sizes, MC and HCF for interior runs, tray cable on the industrial side of the same sites, and feeder cable from switchgear to panels. Data halls add Cat6, Cat6A and fibre by the box, often with part boxes left over.
Distribution centres along the I-70 and I-270 arcs add a different mix. Their maintenance contractors replace cord and control cable on conveyors and sorters, and the leftovers accumulate as short coils rather than reels.
- Full reels from deferred or cancelled project phases
- Part pallets of THHN in mixed colours
- MC and HCF cut-offs from interior fit-out
- Tray and VFD cable from conveyor and sorter work
- Cat6 and fibre boxes, opened and part-used
Docks, appointments and the last hundred feet
Most Columbus sites have a level dock and a trailer court, which makes the loading itself easy. The constraint is time: a live distribution centre books freight windows weeks out, and a data hall under commissioning may refuse a delivery altogether until a phase is handed over.
Tell the desk which of those two you are dealing with. A dark warehouse with a forklift on site can load at short notice. A live facility needs an appointment, a delivery route and sometimes a badge for the driver.
Before a Columbus lot is priced
The facts that matter are phase, tag and colour count. Cable from a cancelled phase should be described as such, with the purchase date if it is on the tag, because age affects the jacket and the buyer will ask. Colour counts matter on THHN because a pallet of black sells differently from a pallet with a balanced set.
Anything that has been pulled and returned to the reel should be separated from the untouched stock. A reel that has been on a pull may have a scuffed jacket and a shortened length, and both change the review.
Briefs for this city
Related pages
Adjacent cities, wire families and regional briefs.
Questions sellers ask
Can I sell cable that a supplier will not take back?
Yes. Restocking fees, cut lengths and expired return windows are the usual reasons cable stays on site, and none of them make the material less usable. The review looks at the tag, the footage and the condition instead of the invoice.
Do you buy part boxes of Cat6?
Part boxes are reviewed with the rest of the lot. A box with a known remaining length and an intact reel is straightforward; a box that has been opened, dragged and re-wrapped is treated as a lower-grade item and priced with that in mind.
How do you handle a lot spread across two buildings?
Describe each building separately, including the dock and the lift access. Two buildings on the same campus are two loading plans even when the terms cover one lot.
Is a cancelled phase worth more than used cable?
It is reviewed differently. Unused stock from a cancelled phase is priced as inventory because it still carries its identity. Used cable from a completed phase is priced on what can be established about length and jacket condition.
Request a quote
Tell the desk what you have in Columbus
Send the basics and a buyer reviews the lot, usually the same working day.
- Reviewed by a buyer, not a scale
- Reels, pallets, partials or a full truckload
- Anywhere in Ohio, one desk
- 01Send the wire type, quantity and pickup city.
- 02A buyer reviews the lot and replies with a basis.
- 03Freight and release are agreed, then the load is booked.
Second look at the lot
Everything helps, but the wire type, the quantity and the pickup city are enough to start.